Pilot Evidence Reference Deployment - Microsoft 365 and Jira

This page is generated from the published markdown artifact and keeps navigation inside the site where possible.

Search the site

Client-side search across published titles and page content. No server required.

Type two or more characters to search the published package.

Purpose

This note turns the pilot evidence kit into a concrete reference deployment.

It assumes a common enterprise stack:

This is a reference build, not a universal mandate.

If the target workplace uses Google Workspace, Azure DevOps, or another equivalent stack, translate the surfaces but keep the logic.

Why this stack

This stack is concrete enough to deploy, but common enough that most organizations can map to it.

It also keeps the evidence loop lightweight:

Named assets to create

Create these assets with stable names so the pilot team knows where the system of record lives.

Microsoft Forms

  1. AI Enablement - Pre-Pilot Survey - Initial Pilot Cohort
  2. AI Enablement - Post-Pilot Survey - Initial Pilot Cohort
  3. AI Enablement - Weekly Pilot Pulse - Initial Pilot Cohort
  4. Optional: AI Enablement - Retrieval Check

Use Microsoft Forms Build - Pilot Evidence Surveys for the exact form structure.

SharePoint or Teams document library

Create one restricted folder:

AI Enablement Pilot Evidence

Suggested subfolders:

Excel workbook

Create one workbook in that folder:

AI Enablement - Pilot Evidence Tracker - Initial Pilot Cohort.xlsx

Use Pilot Evidence Workbook Schema - Excel and SharePoint for the worksheet structure.

Jira configuration

Create the pilot field pack and saved filters in the target Jira project or program scope.

Use Jira Field Pack - Pilot Evidence for the exact fields and filter pattern.

Privacy note

Publish one short internal handling note or policy reference before launch.

Use Pilot Evidence Privacy Posture - Confidential Aggregate Reporting as the default.

First build order

  1. Confirm the privacy posture and sponsor language.
  2. Create the SharePoint or Teams folder.
  3. Create the Excel workbook.
  4. Build the three Microsoft Forms.
  5. Add the Jira field pack and saved filters.
  6. Tag the target workflows before pilot start.
  7. Run the pre-pilot survey.
  8. Start weekly tracking only after the workbook, filters, and ownership model exist.

KPI-to-system map

KPI Primary system Secondary input Owner
Target workflow median cycle time Jira report or export workbook trend note technical enablement lead
Downstream rework rate Jira reopened work or linked follow-up fixes defect tracker technical enablement lead
Review burden pull request system reviewer check-in technical lead
Guardrail exception count exception log or weekly action log manager or reviewer escalation manager sponsor plus enablement lead
Adoption quality score workbook sampled case log rubric technical reviewer
Retrieval follow-up score Microsoft Forms retrieval check workshop notes facilitator or enablement lead
Confidence calibration check survey plus weekly pulse sampled case review enablement lead

Weekly operating rhythm in this stack

Monday or early week

Midweek

End of week

What stays outside the workbook

Do not paste everything into the shared tracker.

Keep these outside the workbook:

The workbook should hold only the working operational data needed to run the pilot.

What makes this deployable

This reference deployment is concrete enough that a small pilot team can build it in a few hours, not a few weeks.

That is the point.

If the team cannot launch this version of the evidence loop, the pilot scope is probably still too broad.